Projects

A Showcase of Some of Our Work

Milton Kyenes Plumbing

Date: 2025Details: The installation of the concealed cistern system by Roca has been completed to a professional standard. The support frame is securely fixed and aligned, with all plumbing connections properly installed. The system is ready for testing and final wall finishing, after which only the toilet fixture and flush

View Project

Milton Kyenes AC Installation

Date: 2025Details: The works involve the installation of a ceiling-mounted HVAC cassette unit, complete with insulated refrigerant pipework, condensate drainage, and associated services.The system has been securely suspended and connected, with neatly routed pipework to ensure efficient operation, providing a reliable climate control solution suitable for a commercial environment.

View Project

Luton AC Installation

Date: 2025Details: The air conditioning unit has been professionally installed at an elevated position to ensure efficient air distribution across the space. All electrical and piping connections are neatly routed and securely fixed, maintaining a clean and organized finish. The unit is fully operational and positioned to support effective cooling

View Project

Cambridge

Date: 2025Details: The works involve the installation of a commercial washroom plumbing system, including multiple wall-mounted urinals with associated water supply and waste pipework.Pipework has been neatly routed and connected to ensure efficient water flow and drainage,providing a functional and hygienic solution suitable for high-use environments.

View Project

London Air Conditionin Service

Date: 2025 Details: The air conditioning unit has been professionally installed and securely positioned, ensuring stable operation and proper alignment. It is enclosed within a purpose-built protective casing that allows for adequate ventilation while safeguarding the unit from external damage and unauthorized access. The installation is complete and meets functional

View Project

Bradford Waterproof

Date: 2025  Details: The works involve installing a below-ground waterproofing system within a basement environment in Bradford. This includes fitting a cavity drainage membrane and integrated drainage channels to manage groundwater ingress in line with a Type C drained protection system. The system directs water to a suitable discharge point,

View Project